Quick answer
Contractor cash flow breaks when your costs fall due before your clients pay. Work out your gap in days (your average payment wait minus how long you can fund your own costs), multiply it by your daily costs, and that's the buffer to hold. Chase, renegotiate or restructure first; use a credit facility only for a gap that keeps recurring.
Key points
- Your gap is the days between paying your costs and getting paid. A 45-day client term with costs due in 14 days is a 31-day gap, every single month.
- The buffer you need is the gap in days multiplied by your daily costs, plus a margin for the client who pays late.
- If you report GST on a cash basis, you only owe GST on a sale once the client pays, so a late invoice doesn't also bring forward a GST bill.
- PAYG instalments can be varied if your income has genuinely dropped, but varying too low can attract interest.
- A line of credit suits a gap that repeats. A one-off hole is usually better fixed by chasing, staging invoices or a smaller start.
Most contractors don’t have an income problem. They have a timing problem: the work is done and the invoice is out, but rent, software, insurance, the accountant and your own living costs don’t wait for the client’s accounts team. This guide gives you a way to measure that wait, shrink it, cover what’s left, and decide honestly whether borrowing belongs in the plan.
How big is your cash flow gap as a contractor?
Your cash flow gap is the number of days between when your costs fall due and when your client’s money actually lands. Add up your average days-to-pay across your last ten invoices, then subtract the days you can fund yourself. That number, not the invoice term on paper, is what your cash has to bridge.
Three coaching questions to answer from your own bank statements:
- What do clients really do? Not “30 days” on the invoice, but the average from invoice date to money in. Late-paying clients drag the average above the term.
- When do my costs fall due? Most of them are weekly or monthly, and some (super for staff, instalments) have fixed dates.
- What’s my daily cost? Total monthly business and personal costs divided by 30.
The gap formula: average days-to-pay − days until costs are due = gap in days. Gap in days × daily cost = the buffer you need.
An illustrative example (not a quote): a contractor’s monthly costs total $9,000, so about $300 a day. Clients average 48 days to pay, and costs fall due across roughly the first 15 days of the month. The gap is about 33 days, so the buffer is about $9,900. Add a margin for the one client who pays at 70 days, and a target of roughly $12k to $13k is realistic. If the contractor holds $4k, the shortfall is the number to solve, not the whole $9,000.
Can you shrink the gap before you fund it?
Yes, and it’s the cheapest fix. Shorten the wait with a deposit, staged invoicing, shorter terms and same-day invoicing, because every day you take off the gap reduces the buffer you’d otherwise need to hold or borrow.
- Invoice the day the milestone is met, not at month end. For a contractor on 30-day terms, month-end invoicing adds an average of 15 days to the wait.
- Stage the work. A deposit up front and a mid-point invoice turn one 60-day wait into three smaller ones.
- Put terms in the contract, including a late fee or right to pause work on overdue accounts.
- Ask for 14 days from new clients. Many will say yes, and the ones who won’t tell you something.
- Make paying easy. Invoices that name the purchase order, go to the right inbox and include bank details get paid sooner.
- Chase on day one past due, politely, by phone rather than only by email.
If the client is a large business, the federal Payment Times Reporting Scheme gives you a little extra leverage. The Regulator requires large businesses to report how they pay small suppliers and publishes the reports on a public register, so you can look up a prospective client’s record before you accept 60-day terms.
Which ATO dates make the gap worse?
Tax dates can turn a normal gap into a squeeze. If you report GST on an accruals basis you owe GST when you invoice, even if the client hasn’t paid, so a slow payer can mean you fund their GST out of your own pocket. If you account on a cash basis, GST follows the cash.
The ATO says businesses with aggregated turnover under $10 million can choose cash accounting for GST, reporting GST for the period you’re paid. It’s worth asking your accountant whether you’re on the right method for how your clients pay.
PAYG instalments are the other pinch. If your income has genuinely dropped, the ATO allows you to vary your PAYG instalment rate on your activity statement. Varying doesn’t change the tax you owe for the year, and the ATO says a varied amount below 85% of what it calculates can attract general interest charge on the shortfall, so vary on a realistic forecast and not a hopeful one.
If you have staff, remember that Payday Super began on 1 July 2026, so super now has to be paid close to payday rather than quarterly. The Fair Work Ombudsman explains the new rules. For a contractor with a team and 45-day clients, that moves one of the biggest costs earlier in the cycle, which widens the gap.
Should you hold, chase, renegotiate or borrow?
Match the fix to the cause. A one-off late payment calls for chasing. A pattern of slow clients calls for new terms. A growing business with a steady pipeline and a predictable gap is the case where a credit facility earns its place.
| Your situation | Likely best move | Why |
|---|---|---|
| One client is 2 weeks late, everyone else is on time | Chase, hold your buffer | A timing blip, not a structural gap |
| All clients pay at 45 to 60 days, costs due at 14 | Shorten terms, then size a buffer | The gap is permanent, so fix the cause |
| You’re growing and taking on more staff or subcontractors | Buffer plus a facility | The gap grows with every new hire |
| One client is more than 30% of income and slipping | Reduce exposure, diversify | Borrowing props up the risk |
| Income is falling, not just late | Cut costs, rebuild the plan | Borrowing for losses just adds repayments |
Our cash runway guide shows how to turn this into a week-by-week forecast, and the cash flow gap funding page lays out the options side by side.
When does a line of credit or short facility make sense?
A business line of credit makes sense when the gap repeats, the work behind it is real and contracted, and your numbers show you can repay it once clients pay. It’s a bridge for timing, not a cure for losses, which is why trading history and clean bank statements matter.
On this site, unsecured, cash flow and line-of-credit options are typically $20,000 to $500,000 and sized on turnover and bank statements for trading businesses. That has two practical consequences for contractors:
- Your bank statements are your application. Money from clients should land in a business account, and personal spending should stay out of it.
- Apply before you’re desperate. A facility arranged while your accounts look healthy is a calmer conversation than one arranged after three late invoices.
A quick self-test before you consider borrowing:
- Is my gap repeating, not a one-off?
- Do I have signed work or a reliable pipeline behind it?
- If every client paid 30% slower, could I still cover the repayments?
- Have I already shortened what I can (deposits, staged invoices, terms)?
- Would a smaller buffer plus better terms do the same job?
Four or five yeses suggests a facility could be a sensible part of the plan. Fewer than three means more groundwork first, and that’s a good answer to get. If the pattern looks like your business, check where you stand here.
What mistakes make a contractor’s gap worse?
The usual culprits are mixing personal and business money, treating invoice terms as the real terms, and borrowing after the squeeze arrives instead of before. Each one is cheap to fix when you spot it early.
- Using one account for everything. You can’t see the gap, and a lender can’t either.
- Planning on invoice terms instead of actual days-to-pay.
- Letting one client grow too big. A big client that pays at 60 days quietly sets your whole gap.
- Spending the GST. On an accruals basis, the GST you’ve charged is not yours until you’ve remitted it.
- Ignoring the gap between contracts. Your buffer needs to cover the wait for the next job as well as the wait for payment.
- Borrowing to cover a loss. If sales are down, not late, the fix is the plan, not a facility.
To see which of your own numbers matter most, the 2-minute funding profile walks you through your stage, goal and what lenders are likely to look at.
Waiting on clients and want to know your options?
If you’ve done the gap sum and the same hole opens every month, you don’t have to wait on a client’s accounts team to keep your own business steady. Having a facility available before the squeeze arrives is calmer than arranging one in the middle of it.
Finding out where you stand takes about 60 seconds, and enquiring doesn’t involve a credit check, so your credit file isn’t touched just for asking. We don’t pass your details around a pile of lenders; your phone won’t light up with strangers. A real person reads your answers, thinks about your actual situation, and rings you to talk it through, including the “not yet, here’s what to do first” answers.
Please fill the form in accurately, with your real turnover, your usual client payment terms and roughly how big the gap is, so we can point you to the option that fits the first time.
Ready when you are
Check your options in about 60 seconds
A few quick questions. Asking won't touch your credit file, your details aren't sent to a pile of lenders, and a real person reads every enquiry.
Frequently asked questions
How do I manage cash flow as a contractor when clients pay in 30 to 60 days?
Measure the gap first: your average days-to-pay minus the days until your own costs fall due. Then shrink it (deposits, staged invoices, shorter terms, invoicing the day work finishes), cover what's left with a buffer worth gap days of costs, and consider a credit facility only if the gap keeps recurring.
How much cash should a contractor keep between contracts?
A workable target is your payment gap plus the time you expect between contracts, multiplied by your daily costs. Many contractors aim for at least two to three months of personal and business costs, but the right number depends on how lumpy your income is and how reliable your clients are.
Do I pay GST on an invoice my client hasn't paid yet?
It depends on your accounting method. The ATO says businesses with aggregated turnover under $10 million can choose cash accounting for GST, where GST goes on your activity statement for the period you're paid. On an accruals basis you report GST when you invoice, whether or not the client has paid. Ask your accountant which you use.
Can I reduce my PAYG instalments if my income has dropped?
Yes, if you expect your tax for the year to be lower than your instalments suggest, you can vary the rate on your activity statement. Be realistic: the ATO says a varied amount less than 85% of what it calculates can attract general interest charge on the shortfall, and varying doesn't change the tax you owe for the year.
Is the Payment Times Reporting Scheme going to make my clients pay faster?
It may help if your client is a large business. The scheme makes large businesses report to a regulator how quickly they pay small business suppliers, and the reports are published on a public register. It's a transparency tool rather than a guarantee, so plan your cash around the terms you actually experience.
When does a business line of credit make sense for a contractor?
When the shortfall is a repeating timing gap rather than a loss: costs due every month, clients paying on 30 to 60 days, and a pipeline of work you trust. Unsecured facilities are typically sized on turnover and bank statements, so a contractor with some trading history is better placed than someone just starting.
What if a client is paying me later and later?
Treat it as a warning. Ask for a deposit or shorter terms on the next job, stop work or pause new work on overdue accounts as your contract allows, and don't let one client become more than a fifth or so of your income. Borrowing to prop up a client who is slipping adds repayments to the risk.